dailylog.rst 2.91 KB
Newer Older
Marion Bandet's avatar
Marion Bandet committed
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
**19 OCT 2015:**

- IBM data management request (IBMassessment.odf)
- regenerate new calibration_pao_29OCT2014.wera located in /run/media/bandma01/SeagateWireless/MEOPAR/DATA/HFRs/WERAs/PAO
- regenerate new calibration_pab_30OCT2014.wera located in /run/media/bandma01/SeagateWireless/MEOPAR/DATA/HFRs/WERAs/PAB
- transfer files via ssh to WERA srv:

        * rsync -v -e ssh /run/media/bandma01/SeagateWireless/MEOPAR/DATA/HFRs/WERAs/PAB/calibration_pab_30OCT2014.wera  wera@132.215.11.14:~/etc/
        * rsync -v -e ssh /run/media/bandma01/SeagateWireless/MEOPAR/DATA/HFRs/WERAs/PAO/calibration_pao_29OCT2014.wera  wera@132.215.11.14:~/etc/


**20 OCT 2015:**

reprocess calibrations with new, corrected phases:

- log onto wera server
17 18
- create a directory 2013244_bkp to run test
- rsync -aud 2013244/ 2013244_bkp/
Marion Bandet's avatar
Marion Bandet committed
19 20
- cd 2013244
- what to do?  
21 22 23 24 25 26 27 28 29 30 31 32 33 34
   
	* cd /home/wera/bin
	* vi do_postprocess_SORT_newCalib.sh

		=> add lines 89 nd 90 rm .SORT, rm .RFI

	* wera_new_calibration.sh 
		=> comment lines 28-32 (mv .SORT to SORT0 and .RFI to .RFI0)

- try on 2013244: > bash -x do_postprocess_SORT_newCalib -s PAO -y 2013244
- to process more than one day at a time, use:> bash -x Process_TimePeriod_wera.sh -s PAO -d 2013245 -f 2013273

- files transfer (PAO) using shell script in /home/wera/bin: do_filetransferssh.sh
 
Marion Bandet's avatar
Marion Bandet committed
35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51

**21 OCT 2015:**

After the new .SORT and .RFI have been generated, we will generate new .crad_pol_lst files with:

do_process_SORT_pol 2013244 2013273 /home/wera/data1/PAO

- work on a shell to find out if we have data in the "raw" directories 
 ./checkDataSize.sh 2012347 2012365
 ./checkDataSize.sh 2013001 2013365
 ./checkDataSize.sh 2014001 2014365
all logged in ~/data1/PAO/RAWfileSize.log


**27 OCT 2015:**

- write script to plot raw data size vs time to assess if there is data at a certain time period (/home/bandma01/Dropbox/UQAR/MEOPAR_Marion/Matlab_Analysis/dataConversion/DataPresence_log2mat.m)
52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79
- run same script on wera server for PAB (same dates)
- modifier Header.txt dans RadialConfigs des CODARs (PAP1) pour mettre CurrMax a 100.
/Volumes/CodarData/Codar/SeaSonde/Configs/RadialConfigs_PAP1_20130201_BAPM_MUSIC402002_nosmooth
- reprocesser CODAR PAP1 pour 10 mai 2013 with:

	* cd hfr-data-processing/postprocessing/codar/
        * ./lancerTraitementSpectraCodar.sh -n ModifCurrMax -s PAP1 -a 2013 -m 05 -j 10


**28 OCT 2015:**

1- reprocesser CODAR PAP1 pour 11 mai 2013

	* ./lancerTraitementSpectraCodar.sh -n ModifCurrMax -s PAP1 -a 2013 -m 05 -j 11

- modifier Header.txt dans RadialConfigs des CODARs (STF2) pour mettre CurrMax a 100.
/Volumes/CodarData/Codar/SeaSonde/Configs/RadialConfigs_STF2_20130206_BAPM_MUSIC402002_nosmooth
- reprocesser CODAR STF2 pour 10 mai 2013
	* ./lancerTraitementSpectraCodar.sh -n ModifCurrMax -s STF2 -a 2013 -m 05 -j 10
	* ./lancerTraitementSpectraCodar.sh -n ModifCurrMax -s STF2 -a 2013 -m 05 -j 11


2- reprocesser WERA PAB pour september 2013 avec nouvelles phases
 => no data at this time